DPR

The DPR begins with an executive summary that provides a high-level overview of the project, including its objectives, scope, and significance. This section sets the stage for the detailed information that follows.
  • PV ARRAY LAYOUT
  • DC SINGLE LINE DIAGRAM
  • AC SINGLE LINE DIAGRAM
  • GENERAL ARRANGEMENT LAYOUT
  • EQUIPMENT LAYOUT
  • EARTHING LAYOUT
  • DETAIL OF EQUIPMENT EARTHING
  • TL-CABLE ROUTE LAYOUT
  • HT-CABLE ROUTE LAYOUT
  • CABLE TRENCH LAYOUT (DC & AC)
  • STRUCTURE FABRICATION DRAWING (RAFTER, PURLIN, CLIT, BRACING ETC)
  • STRUCTURE BUILD OF MATERIAL