DPR
The DPR begins with an executive summary that provides a high-level overview of the project, including its objectives, scope, and significance. This section sets the stage for the detailed information that follows.
- PV ARRAY LAYOUT
- DC SINGLE LINE DIAGRAM
- AC SINGLE LINE DIAGRAM
- GENERAL ARRANGEMENT LAYOUT
- EQUIPMENT LAYOUT
- EARTHING LAYOUT
- DETAIL OF EQUIPMENT EARTHING
- TL-CABLE ROUTE LAYOUT
- HT-CABLE ROUTE LAYOUT
- CABLE TRENCH LAYOUT (DC & AC)
- STRUCTURE FABRICATION DRAWING (RAFTER, PURLIN, CLIT, BRACING ETC)
- STRUCTURE BUILD OF MATERIAL